Weekend Update
May. 11th, 2008 07:32 pmAll of the transition strips are now in, except for the long one in the living room/kitchen doorway, as that's still on backorder. The front door transition will need a little bit of filler caulk as the entryway wood section is slightly taller than the main floor, and that makes the transition strips roll outward just a little, and the miter joint at the corner of the transition doesn't close right (and I couldn't figure out a good compound angle cut to make it work).
I finished the first half of the drop ceiling installation in the basement, using 28 tiles, one accessory clip, and 2 octagonal extender boxes. The ceiling light fixture sticks out from the tiles about 1/2", but unless I special order a 1" extender ring, that's how it's going to be. The other side has all the track up except for around the booze shelves, but I'll get to that later this week probably. Then it'll need about three boxes of tile. I decided to get the first section done (which took a trip to Menards today for 4 tiles) so that if by the time we get tiles they've changed designs, each side will be all one pattern.
teeka dug a new bed and planted asparagus in it, and I put a planter ring aorund it for her. Now, as the asparagus starts to come up, she's going to slowly fill it in until it's the right depth. Then we'll pick up the tarp that the dirt for the bed is currently sitting on and replace the dead grass that'll be underneath it by then.
It took most of a day of fiddling around, but I finally got the lawnmower to start, and it ran long enough to go around one section of the yard once, then it died, and while it would restart, wouldn't keep running. I'm going to let it sit until tomorrow and then try it again, hoping the gumout that's in the gas will do it's thing by then. Then all I have to do is figure out how to take the pull-cord clutch apart so I can see why it isn't engaging most of the time when I pull the rope.
I also finally got around to putting a new blade on the miter saw. The old one has been on for several years, including two flooring projects. Looking at it, it's missing two teeth, and has several chipped teeth. My miter saw now cuts through things a lot easier, which tells me I probably should have changed it a while ago.
I finished the first half of the drop ceiling installation in the basement, using 28 tiles, one accessory clip, and 2 octagonal extender boxes. The ceiling light fixture sticks out from the tiles about 1/2", but unless I special order a 1" extender ring, that's how it's going to be. The other side has all the track up except for around the booze shelves, but I'll get to that later this week probably. Then it'll need about three boxes of tile. I decided to get the first section done (which took a trip to Menards today for 4 tiles) so that if by the time we get tiles they've changed designs, each side will be all one pattern.
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)
It took most of a day of fiddling around, but I finally got the lawnmower to start, and it ran long enough to go around one section of the yard once, then it died, and while it would restart, wouldn't keep running. I'm going to let it sit until tomorrow and then try it again, hoping the gumout that's in the gas will do it's thing by then. Then all I have to do is figure out how to take the pull-cord clutch apart so I can see why it isn't engaging most of the time when I pull the rope.
I also finally got around to putting a new blade on the miter saw. The old one has been on for several years, including two flooring projects. Looking at it, it's missing two teeth, and has several chipped teeth. My miter saw now cuts through things a lot easier, which tells me I probably should have changed it a while ago.