Projects

Aug. 15th, 2006 10:35 pm
revchris: (Default)
[personal profile] revchris
All of the book shelves are now leveled. I still need to bring home the hammer drill and fasten them to the walls.

The water in the kitchen sink now tastes much better - replumbing was done to switch the cold water from softened to non-softened water.

Basement light switches are no longer in the kitchen, they're now at the top and bottom of the stair well (three-way switches).

The basement has a telephone.

The computer room door still needs work (I ripped the stop bead off to get [livejournal.com profile] teeka's desk into the room).

The lawn mower needs work. I'm thinking a new spark plug and some gumout as a first try.

Teeka's computer still needs its speakers and other peripherals.

The garage really needs organizing so that Teeka can get her trailer out to vend. Once it's a little more organized I'll start on inside walls.

More updates as new projects develop.
This account has disabled anonymous posting.
(will be screened if not validated)
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting

If you are unable to use this captcha for any reason, please contact us by email at support@dreamwidth.org

Profile

revchris: (Default)
revchris

June 2010

S M T W T F S
  12345
6789101112
13141516171819
20 212223242526
27282930   

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Mar. 19th, 2026 10:21 am
Powered by Dreamwidth Studios