revchris: (Default)
[personal profile] revchris
I've got all of the pipe assembled, installed, and buried.

Apparently, I'm also full of enough stompy goodness that I made all of the dirt go back into the hole - the ground over the trench is level with its surroundings. Now all I have to do is plant grass to get rid of the mud bog that it still is (I watered it heavily after I stomped it).

I have 9.5' of 1/2" pipe left and 11' of 1-1/2". The full stick of the big stuff plus all of the spare couplings will get returned one of these days (unless someone tells me they have a use for it).

Next we're getting ready for Camelot and the following weekend is Stronghold.
This account has disabled anonymous posting.
(will be screened if not validated)
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting

If you are unable to use this captcha for any reason, please contact us by email at support@dreamwidth.org

Profile

revchris: (Default)
revchris

June 2010

S M T W T F S
  12345
6789101112
13141516171819
20 212223242526
27282930   

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Mar. 19th, 2026 10:37 pm
Powered by Dreamwidth Studios