revchris: (Default)
[personal profile] revchris
The carpet is up, all the base molding is off, and I've started cutting through the paint layer around all the door trim so that it can be removed to make laying the floor that much easier.

Next, we're all off to bed.

Tomorrow we start laying the floor while part of the crew starts on the drop ceiling track downstairs.

Profile

revchris: (Default)
revchris

June 2010

S M T W T F S
  12345
6789101112
13141516171819
20 212223242526
27282930   

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Mar. 19th, 2026 09:22 pm
Powered by Dreamwidth Studios