Floor

Apr. 28th, 2008 09:32 am
revchris: (Default)
[personal profile] revchris
This weekend went pretty well.

I need to get more laminate-to-vinyl transition strips (two closets and the kitchen archway), and finish installing the bathroom and front door strips, and then the floor is done. The bathroom and kitchen strips have to be planed thinner on the vinyl side, but I can do that with the table saw.


Click the picture for mid-sized version or here for high-res version.

Next I have to finish laying track for the drop ceiling and decide what I'm doing around the pipe for the furnace exhaust.

After that, I should have more dirt on hand and we'll start filling in the newest raised planting bed.

And after that, there'll be something else, I'm sure. Like carpeting the dust collector closet to see if that makes it quieter.

Profile

revchris: (Default)
revchris

June 2010

S M T W T F S
  12345
6789101112
13141516171819
20 212223242526
27282930   

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jul. 14th, 2025 01:54 pm
Powered by Dreamwidth Studios