Projects

Aug. 15th, 2006 10:35 pm
revchris: (Default)
[personal profile] revchris
All of the book shelves are now leveled. I still need to bring home the hammer drill and fasten them to the walls.

The water in the kitchen sink now tastes much better - replumbing was done to switch the cold water from softened to non-softened water.

Basement light switches are no longer in the kitchen, they're now at the top and bottom of the stair well (three-way switches).

The basement has a telephone.

The computer room door still needs work (I ripped the stop bead off to get [livejournal.com profile] teeka's desk into the room).

The lawn mower needs work. I'm thinking a new spark plug and some gumout as a first try.

Teeka's computer still needs its speakers and other peripherals.

The garage really needs organizing so that Teeka can get her trailer out to vend. Once it's a little more organized I'll start on inside walls.

More updates as new projects develop.

Date: 2006-08-16 07:57 pm (UTC)
From: [identity profile] alyska.livejournal.com
my point exactly.

share the love! (and the *snerk* WOOD!)

Profile

revchris: (Default)
revchris

June 2010

S M T W T F S
  12345
6789101112
13141516171819
20 212223242526
27282930   

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Mar. 19th, 2026 02:17 pm
Powered by Dreamwidth Studios